{"id":2907,"date":"2026-06-22T00:00:00","date_gmt":"2026-06-22T03:00:00","guid":{"rendered":"http:\/\/localhost\/wordpress\/index.php\/2026\/06\/22\/autorizada-construcao-de-ponte-para-substituir-balsa-entre-as-gos-080-e-237-em-barro-alto\/"},"modified":"2026-09-09T23:35:19","modified_gmt":"2026-09-10T02:35:19","slug":"autorizada-construcao-de-ponte-para-substituir-balsa-entre-as-gos-080-e-237-em-barro-alto","status":"publish","type":"post","link":"https:\/\/goias.gov.br\/goinfra\/autorizada-construcao-de-ponte-para-substituir-balsa-entre-as-gos-080-e-237-em-barro-alto\/","title":{"rendered":"Autorizada constru\u00e7\u00e3o de ponte para substituir balsa entre as GOs 080 e 237, em Barro Alto"},"content":{"rendered":"<p><em>Estrutura, que ter&aacute; 178 metros de extens&atilde;o, vai garantir trafegabilidade permanente no trecho<\/em><\/p>\n<p>O Governo de Goi&aacute;s, por meio da Ag&ecirc;ncia Goiana de Infraestrutura e Transportes (Goinfra) lan&ccedil;ou, no &uacute;ltimo s&aacute;bado (20\/6), as obras de constru&ccedil;&atilde;o da ponte sobre o Rio Maranh&atilde;o, na GO-080, em Barro Alto. A estrutura substituir&aacute; a atual travessia por meio da Balsa Darlene, no trecho entre Santo Ant&ocirc;nio da Laguna e o entroncamento com a GO-237. &nbsp; &nbsp;<\/p>\n<p>Durante o evento realizado para assinatura da ordem de servi&ccedil;o, em Barro Alto, a presidente da autarquia, Eliane Simonini, refor&ccedil;ou&nbsp;que a travessia de concreto&nbsp;ter&aacute; extens&atilde;o de 178 metros e&nbsp;vai garantir a trafegabilidade permanente no trecho ao longo do ano.&nbsp;<\/p>\n<p>&quot;A ponte vai eliminar interrup&ccedil;&otilde;es e limita&ccedil;&otilde;es operacionais do transporte fluvial, diminuir o tempo de deslocamento e melhorar a mobilidade regional, al&eacute;m de contribuir para o desenvolvimento regional ao beneficiar o transporte de pessoas e produ&ccedil;&otilde;es agroindustriais&quot;, destacou, ao lado do&nbsp;vice-presidente da Goinfra,&nbsp;Alexandre dos Santos.&nbsp;<\/p>\n<p><img decoding=\"async\" alt=\"\" src=\"https:\/\/goias.gov.br\/goinfra\/wp-content\/uploads\/sites\/77\/2026\/09\/evento_balsa.jpeg\" width=\"500\" class=\"aligncenter size-full\"><\/p>\n<p>O investimento previsto &eacute; de R$ 16.899.786,15, com recursos do Tesouro Estadual. A previs&atilde;o &eacute; de que a travessia seja entregue at&eacute; julho de 2027.<\/p>\n<p>Os prefeitos de Barro Alto, &Aacute;lvaro Machado, e de Niquel&acirc;ndia, Eduardo Morais, participaram do lan&ccedil;amento das obras. O deputado federal Jos&eacute; Nelto e o senador da Rep&uacute;blica Vanderlan Cardoso tamb&eacute;m prestigiaram a solenidade.<br \/>\n<em>Fotos: Goinfra<\/em><br \/>\n<strong>Ag&ecirc;ncia Goiana de Infraestrutura e Transportes (Goinfra)<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estrutura, que ter&aacute; 178 metros de extens&atilde;o, vai garantir trafegabilidade permanente no trecho<\/p>\n","protected":false},"author":1422,"featured_media":236967,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","_links_to":"","_links_to_target":""},"categories":[68],"tags":[],"class_list":["post-2907","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticias"],"rttpg_featured_image_url":{"full":["https:\/\/goias.gov.br\/goinfra\/wp-content\/uploads\/sites\/77\/2026\/06\/0-11-1.jpg",1600,1198,false],"landscape":["https:\/\/goias.gov.br\/goinfra\/wp-content\/uploads\/sites\/77\/2026\/06\/0-11-1.jpg",1600,1198,false],"portraits":["https:\/\/goias.gov.br\/goinfra\/wp-content\/uploads\/sites\/77\/2026\/06\/0-11-1.jpg",1600,1198,false],"thumbnail":["https:\/\/goias.gov.br\/goinfra\/wp-content\/uploads\/sites\/77\/2026\/06\/0-11-1-150x150.jpg",150,150,true],"medium":["https:\/\/goias.gov.br\/goinfra\/wp-content\/uploads\/sites\/77\/2026\/06\/0-11-1-300x225.jpg",300,225,true],"large":["https:\/\/goias.gov.br\/goinfra\/wp-content\/uploads\/sites\/77\/2026\/06\/0-11-1-1024x767.jpg",1024,767,true],"1536x1536":["https:\/\/goias.gov.br\/goinfra\/wp-content\/uploads\/sites\/77\/2026\/06\/0-11-1-1536x1150.jpg",1536,1150,true],"2048x2048":["https:\/\/goias.gov.br\/goinfra\/wp-content\/uploads\/sites\/77\/2026\/06\/0-11-1.jpg",1600,1198,false]},"rttpg_author":{"display_name":"","author_link":"https:\/\/goias.gov.br\/goinfra\/author\/"},"rttpg_comment":0,"rttpg_category":"<a href=\"https:\/\/goias.gov.br\/goinfra\/categoria\/noticias\/\" rel=\"category tag\">Not\u00edcias<\/a>","rttpg_excerpt":"Estrutura, que ter&aacute; 178 metros de extens&atilde;o, vai garantir trafegabilidade permanente no trecho","_links":{"self":[{"href":"https:\/\/goias.gov.br\/goinfra\/wp-json\/wp\/v2\/posts\/2907","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/goias.gov.br\/goinfra\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/goias.gov.br\/goinfra\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/goias.gov.br\/goinfra\/wp-json\/wp\/v2\/users\/1422"}],"replies":[{"embeddable":true,"href":"https:\/\/goias.gov.br\/goinfra\/wp-json\/wp\/v2\/comments?post=2907"}],"version-history":[{"count":2,"href":"https:\/\/goias.gov.br\/goinfra\/wp-json\/wp\/v2\/posts\/2907\/revisions"}],"predecessor-version":[{"id":236970,"href":"https:\/\/goias.gov.br\/goinfra\/wp-json\/wp\/v2\/posts\/2907\/revisions\/236970"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/goias.gov.br\/goinfra\/wp-json\/wp\/v2\/media\/236967"}],"wp:attachment":[{"href":"https:\/\/goias.gov.br\/goinfra\/wp-json\/wp\/v2\/media?parent=2907"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/goias.gov.br\/goinfra\/wp-json\/wp\/v2\/categories?post=2907"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/goias.gov.br\/goinfra\/wp-json\/wp\/v2\/tags?post=2907"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}